StevensonScreenBox
Parameters
Insert the two banks of downward-facing slats between the cheeks, then fit the floor and overhanging roof. Bevel the upper edges before bonding the roof. Check shelter and airflow with your installed sensors. The original kit has two header strips and a narrow instrument floor supported by locking brackets. The glued roof has two assembly guide lines.
Settings for Finger Joints
Settings for a Stevenson Screen.
StevensonScreenBox Settings
Default Settings
Cutting parity checks passed
Checked against Boxes.py 9ae1b7aea64120923f4b70a7e04a498f824643b4 at 0.01 mm tolerance.
Published default and alternate settings.
Maximum sampled deviation 0.0009 mm.